Installation Vacuum Sealer Setting Manual
페이지 정보
본문
- Connect electricity and compreseed air to the machine.
- Connect the foot s/w to the machine
- Fix the work tray to the machine.
- Check whether compreseed air pressure on the guage of the air regulator is ok ( 6.5㎏/㎠ ).
- Turn on the NFB of the machine
- Check whether there is " AIRZERO" on the LCD of the control box.
관련링크
-
http://youtu.be/mVofMaYCjWQ
86회 연결